Pool Feasibility Study- Public Input

Pool Feasibility Study- Public Input
Posted on 08/06/2019
Hampden PoolRecently the Township retained Waters Edge Aquatic Design to complete a pool feasibility study for Hampden Pool.  This project is funded through a DCNR grant, as well as, funds generated by the pool facility.  The main swimming area at Hampden Pool was constructed approximately 50 years ago.  The pool facility is funded completely by user fees, not taxpayer dollars.  The goal of the feasibility study is to help plan a path for the pool complex moving forward.  The feasibility study will assess maintenance and operational needs, evaluate current and future amenities, pricing of memberships, regional market analysis and develop recommendations for improvements to the facility and operations. 
 
Part of feasibility study requires community input.  Two public meetings are planned.  Consultants from Waters Edge Aquatic Design will meet with the public and provide an overview of the existing facility, provide an assessment of the complex, and solicit public comment in order to provide a future recommended plan.  The meetings are scheduled for Sept 10 at 6:30pm and Oct 30 at 7:30pm both at the Hampden Township Admin Building at 230 S. Sporting Hill Rd. Those unable to make the public meetings, can provide feedback via an online questionnaire at http://survey.constantcontact.com/survey/a07egi10vdtjypvrroi/start
Township of Hampden | All Rights Reserved | Powered by: Civic Live | © 2018 West Corporation | Intranet Login | Login | Employee Email