THE OFFICIAL WEBSITE OF HAMPDEN TOWNSHIP

WHERE PEOPLE COME FIRST

Staff:

Director of Community Development
Darrell McMillan

Asst. Director of Community Development
Jon Powers

Community Development Secretary
Rita Finkboner 

Codes Enforcement Officer (Field Inspector)
Mark Anderson

Plan Reviewer
Ivan Miller

Department of Community Development

Open 8:00am to 4:30pm every weekday.

Phone (717)761-0119  Fax (717)761-7267

Land Development/Subdivision Plan Submission (Download Form)

Information and application form for subdivision/land development plan approval are available in the Department of Community Development office.

Building Permit

Application forms are available in the Community Development Department office and also can be mailed or faxed to the applicant. Two (2) sets of construction documents must be submitted with building permit applications. The processing time is within 15 business days for most standard residential and within 30 business days for most non-residential permits.  Applications are reviewed on a first-come, first-served basis.

The Community Development Department will review applications for the following permits:

Street Cut Permit

Septic Permit

Driveway Permit (Download Form)

Excavation and Fill Permit (Download Form)

Building Permit – Residential  (Download Form)

For any construction work that exceeds $500.00 in total project cost.

Exceptions:

  • Non-structural roof re-shingling
  • Window replacement
  • Replacement siding, fascia, gutters, downspouts
  • Kitchen and bathroom remodeling that is repair or replacement of existing items

Building Permit – Non-Residential   (Download Form)

Contractor License Application (Download Form)

Plumbing Permit  (Download Form)

Plumbing License Application (Download Form)

Zoning Permit (Download Form)

Change of building footprints; sheds, fences, all accessory buildings, increase in impervious coverage.

Generally, fences may be placed on property lines, although the Community Development Department recommends a minimum setback to address issues of maintenance and access. The setbacks for a residential, detached accessory structure are generally ten feet (10′) from a side or rear lot line. The setbacks are reviewed during the zoning approval process.

Sewer Connection Permit

New connection or increase in flow

Certificate of Use (Download Form)

For Non-Residential change of use.  Required by Hampden Township Zoning Ordinance.

Sign Permit (Download Form)

Permanent and temporary signs.

Request for Ordinance Amendment (Download Form)

Burn Permit (Download Form)
Application for a burn permit shall be made at least ten (10) working days prior to the date of the proposed burn.